FULLER RD over BLACK STREAM

0.6 MI W HERMON · County 019, Maine · Built 2010 · 2 Lanes · 1,539 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
5102
Year Built
2010
Length
18.3 m (60 ft)
Max Span
17.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,539
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.