RIVER RD over GILBERT BK

1.2 MI N MADISON TL · County 025, Maine · Built 2022 · 2 Lanes · 4,062 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
3726
Year Built
2022
Length
13.1 m (43 ft)
Max Span
11.3 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
4,062
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.