ALLAGASH RD over PELLETIER BROOK
4.0 MI WLY OF ST FRANCIS · County 003, Maine · Built 1973 · 2 Lanes · 775 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.089039, -69.023819
This bridge is in worse condition than 53.7% of bridges in County 003. The average bridge in Maine is 0 years old; this one is 53 years old.
Bridge Details
- Structure #
- 3296
- Year Built
- 1973
- Length
- 27.4 m (89.9 ft)
- Max Span
- 25.9 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 775
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.