DAVIS ST over PLEASANT RIVER

4.0 MI N OF MILO · County 021, Maine · Built 2019 · 2 Lanes · 1,040 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
3222
Year Built
2019
Length
63.9 m (209.6 ft)
Max Span
63 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
1,040
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.