N STONINGTON RD over MILL POND OUTLET
DEERISLE-STONINGTON T.L. · County 009, Maine · Built 2023 · 2 Lanes · 2,644 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 7 | Good |
Location
44.188519, -68.660211
This bridge is in worse condition than 23.2% of bridges in County 009. The average bridge in Maine is 0 years old; this one is 3 years old.
Bridge Details
- Structure #
- 3063
- Year Built
- 2023
- Length
- 13.9 m (45.6 ft)
- Max Span
- 12.2 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,644
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.