DEPOT RD over SACO RIVER

1 MI NE OF JCT RTE 25 · County 005, Maine · Built 1997 · 2 Lanes · 3,530 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3025
Year Built
1997
Length
76.7 m (251.6 ft)
Max Span
37.5 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
3,530
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.