ROUTE 1 over PENOBSCOT RIV (E CHAN)

INTERSECT US 1-3-15 · County 009, Maine · Built 1988 · 2 Lanes · 10,092 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3010
Year Built
1988
Length
220.9 m (724.7 ft)
Max Span
60.9 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
10,092
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.