ROUTE 1 over TAUNTON RIVER

4.5 MI E JCT 182 ON 1 · County 009, Maine · Built 1999 · 2 Lanes · 7,522 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2973
Year Built
1999
Length
311.6 m (1022.3 ft)
Max Span
38.8 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
7,522
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.