ROUTE THREE over SHEEPSCOT RIVER

4.5 MI ELY OF CHINA TL · County 027, Maine · Built 1974 · 2 Lanes · 4,875 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
2758
Year Built
1974
Length
53.3 m (174.9 ft)
Max Span
25.9 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
4,875
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.