MOODY RD over MARSH STREAM

1.4 MI E OF JCT RTE 141 · County 027, Maine · Built 1963 · 2 Lanes · 420 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
2526
Year Built
1963
Length
26.8 m (87.9 ft)
Max Span
25.9 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
420
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.