US RT 2 W over HOOPER(BUTTERFIELD) BRK.

0.1 MI WLY JCT RTE 17 · County 007, Maine · Built 2023 · 2 Lanes · 3,892 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
2341
Year Built
2023
Length
7.2 m (23.6 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
3,892
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.