HERRING TRACT RD over DAVIS BROOK

150 FT N OF JCT RTE 150 · County 021, Maine · Built 2019 · 2 Lanes · 236 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
2317
Year Built
2019
Length
24.1 m (79.1 ft)
Max Span
23.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
236
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.