FROST ST over COMBOLASSE STREAM

1 MI E RTE 2 · County 019, Maine · Built 1938 · 2 Lanes · 527 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
2298
Year Built
1938
Length
7.2 m (23.6 ft)
Max Span
6.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
527
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.