BRIDGE STREET over BRIDGE STREET
0.06 MIES NORTH OF US BOR · County 003, Maine · Built 2011 · 2 Lanes · 250 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.151042, -67.930778
This bridge is in worse condition than 26.4% of bridges in County 003. The average bridge in Maine is 0 years old; this one is 15 years old.
Bridge Details
- Structure #
- 2195002P0000000
- Year Built
- 2011
- Length
- 10.5 m (34.4 ft)
- Max Span
- 9.4 m
- Width
- 20.3 m (66.6 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $30,000
- Total Project Cost
- $45,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.