POST RD over MERRILAND RIVER

1.2 MI S TOWNLINE · County 031, Maine · Built 2018 · 2 Lanes · 8,910 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
2126
Year Built
2018
Length
22.3 m (73.2 ft)
Max Span
21.3 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
8,910
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.