MAIN ST over GREAT POND OUTLET

5.1 MI N JCT OF RTE 135 · County 011, Maine · Built 1996 · 2 Lanes · 3,504 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2063
Year Built
1996
Length
44.1 m (144.7 ft)
Max Span
13.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
3,504
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.