I 95 SB over PUSHAW STREAM

.7 MI.S. #43 · County 019, Maine · Built 1965 · 2 Lanes · 6,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1424
Year Built
1965
Length
57 m (187 ft)
Max Span
21.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
6,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.