I 95 NB over HOYT BROOK

3 MI N TL (MILE 211.6) · County 019, Maine · Built 1971 · 2 Lanes · 4,610 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
1420
Year Built
1971
Length
7.8 m (25.6 ft)
Max Span
6.7 m
Lanes
2
Daily Traffic
4,610
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.