PRECOURT ST over B & M RR

0.4 MI SEOF ROUTE 111 · County 031, Maine · Built 1989 · 2 Lanes · 15,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

43.472819, -70.491261

This bridge is in worse condition than 41.1% of bridges in County 031. The average bridge in Maine is 0 years old; this one is 37 years old.

Nearby Bridges

Bridge Details

Structure #
0822
Year Built
1989
Length
132.9 m (436 ft)
Max Span
28.7 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
15,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.