I-95 (NB) over CENTRAL STREET

0.112 mi NW of Orchard Ln · County 011, Maine · Built 1956 · 2 Lanes · 16,080 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0554
Year Built
1956
Reconstructed
1983
Length
37.8 m (124 ft)
Max Span
11.6 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
16,080
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.