WEST GRAY ROAD over I-95

0.235 mi W of Center Rd · County 005, Maine · Built 1956 · 3 Lanes · 20,240 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0289
Year Built
1956
Reconstructed
1995
Length
72.8 m (238.8 ft)
Max Span
24.4 m
Width
10.4 m (34.1 ft)
Lanes
3
Daily Traffic
20,240
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.