W. FALMOUTH/CUMBER over I-95

0.304 mi W of SR 100&26 · County 005, Maine · Built 1956 · 2 Lanes · 5,870 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0278
Year Built
1956
Reconstructed
2012
Length
67.1 m (220.1 ft)
Max Span
20.7 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
5,870
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.