SLIGO RD over MAIN CENTRAL RAILROAD

.6 MI SE ROUTE 9 · County 005, Maine · Built 2000 · 2 Lanes · 580 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0208
Year Built
2000
Length
17 m (55.8 ft)
Max Span
16.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
580
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Railroad
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.