BIA ROUTE 1530 over MATTAMISCONTIS STREAM

3.15 KM NW OF ACCESS ROAD · County 019, Maine · Built 2014 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000S50018B0012
Year Built
2014
Length
15.3 m (50.2 ft)
Max Span
14.8 m
Width
4.4 m (14.4 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.