HOLLY SPRINGS ROAD over TRIB TO BIRDS CREEK

VE 948 374 · County 115, Louisiana · Built 1978 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
DAPFORPOK000H19
Year Built
1978
Reconstructed
2009
Length
15.2 m (49.9 ft)
Max Span
14.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.