LA0010 over GORMAN CREEK

3.5 M EAST OF LA 450 · County 117, Louisiana · Built 1991 · 2 Lanes · 1,478 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
625902770304601
Year Built
1991
Length
18 m (59.1 ft)
Max Span
5.8 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
1,478
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.