LA0437 over BOGUE FALAYA RIVER

1.35 MILES NORTH US 190 · County 103, Louisiana · Built 2003 · 2 Lanes · 4,871 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
625202790101351
Year Built
2003
Length
57.9 m (190 ft)
Max Span
5.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
4,871
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$572,000
Total Project Cost
$858,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.