LA 25 over West Prong Bogue Falaya
1.9 miles NE of LA 450 · County 103, Louisiana · Built 1963 · 2 Lanes · 9,685 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
30.6885, -90.1839
This bridge is in worse condition than 45.4% of bridges in County 103. The average bridge in Louisiana is 0 years old; this one is 63 years old.
Nearby Bridges
LA0025 over DRAIN
Built 1963
LA0450 over Clark Branch
Built 1958
Joseph Rd over BOGUE FALAYA RIVER
Built 1992
LA0450 over MARYS BRANCH
Built 1958
LA0025 over DRAIN
Built 1963
LA0025 over W BOGUE FALAYA
Built 1964
LA0040 over DRAIN
Built 1979
LA0040 over BOGUE FALAYA RELIEF
Built 1978
LA0040 over BOGUE FALAYA RIVER
Built 1978
LA0040 over DRAIN
Built 1978
Bridge Details
- Structure #
- 625200590217001
- Year Built
- 1963
- Length
- 54.9 m (180.1 ft)
- Max Span
- 6.1 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 9,685
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $546,000
- Total Project Cost
- $819,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.