W. Hubert Stilley over TAYLOR BRANCH

9.2 MI NE OF 43 EXIT · County 063, Louisiana · Built 1960 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
623230354903551
Year Built
1960
Length
17.7 m (58.1 ft)
Max Span
5.8 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
150
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$147,000
Total Project Cost
$220,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.