I0012 over SHERWOOD FOREST BLVD

1.2 Mi East of US 61 · County 033, Louisiana · Built 1970 · 3 Lanes · 28,013 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
611704540103701
Year Built
1970
Reconstructed
1986
Length
60.7 m (199.1 ft)
Max Span
25.3 m
Width
19.5 m (64 ft)
Lanes
3
Daily Traffic
28,013
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.