LA0019 over NORTH CANAL

2.0 M N of LA 19&LA 64 · County 033, Louisiana · Built 1951 · 2 Lanes · 11,198 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
611702500110891
Year Built
1951
Length
29.9 m (98.1 ft)
Max Span
7.3 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
11,198
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$325,000
Total Project Cost
$487,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.