New Rafe Mayer Rd over DRAINAGE BAYOU

0.5 MI W OF LA.19 · County 033, Louisiana · Built 2017 · 2 Lanes · 737 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
611700000610368
Year Built
2017
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
737
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.