Bayou Dr W over BAYOU PIERRE PASS

PIERRE PART · County 007, Louisiana · Built 1988 · 2 Lanes · 2,520 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
610429578911251
Year Built
1988
Length
43.3 m (142.1 ft)
Max Span
13.4 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
2,520
Material
Steel
Design
Movable - Lift
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.