LA0939 over BAYOU FRANCOIS

0.8 M SE of US 61 · County 005, Louisiana · Built 1962 · 2 Lanes · 8,203 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
610308032301111
Year Built
1962
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
8,203
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000
Total Project Cost
$412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.