LA0030 over NEW RIVER
LA0030 · County 005, Louisiana · Built 1968 · 2 Lanes · 12,126 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.235394, -91.026036
This bridge is in worse condition than 22.2% of bridges in County 005. The average bridge in Louisiana is 0 years old; this one is 58 years old.
Nearby Bridges
Louis White Rd over DRAINAGE BAYOU
Built 1989
River Oaks Rd over Darain Bayou
Built 2020
Coco Rd over DRAIN BAYOU
Built 2014
LA0074 over BAYOU BREAUX
Built 1955
Spellman Rd over DRAINAGE DITCH
Built 1988
LA0030 over BAYOU BRAUD
Built 1968
LA0073 over NEW RIVER
Built 1957
Stevenson Rd over DRAINAGE BAYOU
Built 1970
LA0429 over DUTCHTOWN DRAIN
Built 1957
New River Canal Rd over DRAINAGE BAYOU
Built 2001
Bridge Details
- Structure #
- 610304140301401
- Year Built
- 1968
- Length
- 36.6 m (120.1 ft)
- Max Span
- 6.1 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 12,126
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $390,000
- Total Project Cost
- $585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.