LA0022 over PIERRES DRAINAGE
1.0 M SW of LA 22&LA 16 · County 005, Louisiana · Built 1960 · 2 Lanes · 8,068 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
30.249319, -90.779608
This bridge is in worse condition than 22.2% of bridges in County 005. The average bridge in Louisiana is 0 years old; this one is 66 years old.
Nearby Bridges
LA0022 over AMITE DIVERSION CANAL
Built 1960
Cline Rd over CANAL
Built 2013
LA0022 over LITTLE LAKE RELIEF
Built 1959
LA0016 over AMITE RIVER RELIEF
Built 1960
River Highlands Dr over BAYOU PIERRE
Built 1998
LA0016 over AMITE RIVER-FRENCH SMEN
Built 1960
LA0016 over AMITE RIVER REL
Built 1960
LA0022 over DENHAM CANAL
Built 1959
Rogers C Rd over SAVERIO CANAL
Built 2002
LA0016 over BAYOU KING GEORGE
Built 1960
Bridge Details
- Structure #
- 610302660207401
- Year Built
- 1960
- Length
- 24.4 m (80.1 ft)
- Max Span
- 6.1 m
- Width
- 9 m (29.5 ft)
- Lanes
- 2
- Daily Traffic
- 8,068
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $275,000
- Total Project Cost
- $412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.