LA0022 over PANAMA CANAL
0.6 M SW of LA 22&LA 70 · County 005, Louisiana · Built 1950 · 2 Lanes · 22,576 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
30.160233, -90.886542
This bridge is in worse condition than 49.1% of bridges in County 005. The average bridge in Louisiana is 0 years old; this one is 76 years old.
Nearby Bridges
LA0070 over STREAM
Built 1966
I0010 over LA 22
Built 1979
I0010 over LA 22
Built 1979
LA0070 over PANAMA CANAL
Built 1966
I0010 over DRAINAGE CANAL
Built 1979
I0010 over DRAINAGE CANAL
Built 1979
LA0070 over STREAM
Built 1966
LA0941 over I-10
Built 1979
LA0022 over BAYOU CONWAY
Built 1990
LA0022 over BAYOU CONWAY
Built 1990
Bridge Details
- Structure #
- 610302660106851
- Year Built
- 1950
- Length
- 22.6 m (74.1 ft)
- Max Span
- 7.3 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 22,576
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $257,000
- Total Project Cost
- $385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.