BIG LAKE MGT RD over BIG ROARING BAYOU

0.407 MI N OF LA.4 · County 041, Louisiana · Built 2017 · 1 Lanes · 30 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
582100000580176
Year Built
2017
Length
61 m (200.1 ft)
Max Span
7.6 m
Width
4.8 m (15.7 ft)
Lanes
1
Daily Traffic
30
Material
Concrete
Design
Slab
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.