US0084 over LAS RR

3.8 MI EAST OF LA 1228 · County 127, Louisiana · Built 1959 · 2 Lanes · 5,495 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
086400220219471
Year Built
1959
Reconstructed
2016
Length
36.9 m (121.1 ft)
Max Span
12.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
5,495
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$392,000
Total Project Cost
$588,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.