LA0489 over BILLY CREEK

2.2 MI. N. OF LA 121 · County 115, Louisiana · Built 1999 · 2 Lanes · 639 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
085801380402201
Year Built
1999
Length
36.6 m (120.1 ft)
Max Span
6.1 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
639
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.