LA0008 over CALCASIEU RELIEF CREEK

1.52 MILES NE OF LA 121 · County 115, Louisiana · Built 2015 · 2 Lanes · 931 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

31.222008, -93.1055

This bridge is in worse condition than 26.1% of bridges in County 115. The average bridge in Louisiana is 0 years old; this one is 11 years old.

Nearby Bridges

Bridge Details

Structure #
085800000080609
Year Built
2015
Length
146.3 m (480 ft)
Max Span
6.1 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
931
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.