DOSHIE RD over CHERRY WINCHE CREEK TRIB

1.3 Mi N of LA 112 · County 079, Louisiana · Built 2024 · 2 Lanes · 325 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
084000000084000
Year Built
2024
Length
14 m (45.9 ft)
Max Span
3 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
325
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.