FDR 120 over PANTHER BAYOU

NO DATA ENTERED · County 043, Louisiana · Built 1981 · 1 Lanes · 15 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
080601000002120
Year Built
1981
Reconstructed
1998
Length
40.5 m (132.9 ft)
Max Span
5.8 m
Width
5.1 m (16.7 ft)
Lanes
1
Daily Traffic
15
Material
Prestressed Concrete
Design
Channel Beam
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$24,000,000
Total Project Cost
$24,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.