LA0107 over BAYOU JACK RELIEF

0.52 MI. SOUTH OF LA 1179 · County 009, Louisiana · Built 1958 · 2 Lanes · 1,214 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
080501470305541
Year Built
1958
Length
23.2 m (76.1 ft)
Max Span
5.8 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,214
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$262,000
Total Project Cost
$393,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.