WEST DIVISION ST over PETITE MARAIS
1.24 MI W OF LA 26 · County 053, Louisiana · Built 2019 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.220569, -92.684569
This bridge is in worse condition than 34.7% of bridges in County 053. The average bridge in Louisiana is 0 years old; this one is 7 years old.
Nearby Bridges
TOUCHET ROAD over GRAND MARAIS BAYOU
Built 1974
US0090 over CANAL
Built 1974
US0090 over BAYOU
Built 2022
US0090 over B.N. & S.F. R/R CREEK
Built 2002
WEST RACCA ROAD over EAST GRAND MARAIS DITCH
Built 1979
US0090 over CHENE BAYOU
Built 1985
I0010 over MID BAYOU CHENE
Built 1965
I0010 Frontage RD over MID BAYOU CHENE
Built 1965
I0010 over MID BAYOU CHENE
Built 1965
BERKEN ROAD over GRAND MARAIS BAYOU
Built 1978
Bridge Details
- Structure #
- 072700000070026
- Year Built
- 2019
- Length
- 36.6 m (120.1 ft)
- Max Span
- 6.1 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.