MERMENTAU RIVER RD over KINGS BAYOU

0.6 MILES NORTH OF LA 82 · County 023, Louisiana · Built 2015 · 2 Lanes · 82 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
071200000500208
Year Built
2015
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
82
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.