VINCENT ST over CANAL
0.1 MI. N OF PERRY ST · County 019, Louisiana · Built 1968 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
30.185781, -93.585739
This bridge is in worse condition than 32.5% of bridges in County 019. The average bridge in Louisiana is 0 years old; this one is 58 years old.
Nearby Bridges
FANCHER ST over CANAL
Built 1968
LA3063 over DRAINAGE DITCH
Built 1968
STEVENSON ST over GUM CREEK
Built 1968
HORRIDGE STREET over CANAL
Built 2013
LA3063 over I-10
Built 1966
I0010 over VINTON CANAL
Built 1966
I0010 over VINTON CANAL
Built 1966
HORRIDGE STREET over HAMPTON COULEE
Built 2020
WILLIAMS RD over HAMPTON COULEE
Built 2011
US0090 over HAMPTON COULEE
Built 1954
Bridge Details
- Structure #
- 071030122933491
- Year Built
- 1968
- Length
- 11.6 m (38.1 ft)
- Max Span
- 5.8 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $108,000
- Total Project Cost
- $162,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.