LA0385 over HIPPOLYTE COULEE

3.8 MI N OF LA 401 · County 019, Louisiana · Built 1955 · 2 Lanes · 3,197 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
071001950303761
Year Built
1955
Reconstructed
2017
Length
11 m (36.1 ft)
Max Span
3 m
Width
25.3 m (83 ft)
Lanes
2
Daily Traffic
3,197
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$153,000
Total Project Cost
$229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.