LA0109 over GULLY
0.1 MI S OF LA 12 · County 019, Louisiana · Built 1957 · 2 Lanes · 1,749 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
3
Serious
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 3 | Serious |
| Substructure | 5 | Fair |
Location
30.319125, -93.664036
This bridge is in worse condition than 99.1% of bridges in County 019. The average bridge in Louisiana is 0 years old; this one is 69 years old.
Nearby Bridges
GREEN MOORE RD over HOUSTON RIVER
Built 2003
LA 12 over ASHWORTH SLOUGH
Built 2023
LA 12 over HURSEY SLOUGH
Built 2023
LA0109 over BAYOU
Built 2010
LA0012 over BEAR HEAD CREEK
Built 1956
LA 12 over MUD LAKE
Built 2023
LA 12 over WASH OUT SLOUGH
Built 2023
OLD RIVER RD over BESS BRANCH
Built 1999
LA0012 over CANAL
Built 1956
LA0012 over MORMAN SLOUGH
Built 2012
Bridge Details
- Structure #
- 071001870111321
- Year Built
- 1957
- Length
- 11.9 m (39 ft)
- Max Span
- 5.8 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,749
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $156,000
- Total Project Cost
- $234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.