I0010 over MAPLE FORK BAYOU

1.44 MI W OF I-210 · County 019, Louisiana · Built 2022 · 4 Lanes · 11,437 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
071000000070266
Year Built
2022
Length
61 m (200.1 ft)
Max Span
6.1 m
Width
22.8 m (74.8 ft)
Lanes
4
Daily Traffic
11,437
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.